Business News

BIH ELEKTROPRIVEDA ANNOUNCES PUBLIC CALL FOR CONSTRUCTION OF TUZLA BLOCK 7 POWER POINT

Business News

08/08/2012

The B&H Elektroprivreda Public Utility announced public call for prequalification for election of Project partner for joint investment in Block 7 - 450 MW of the Tuzla Power Plant.  

The Project Partner will be elected based on international open public tender which will include two phases: Prequalification within which the qualified candidates will be elected and Collection of offers from qualified candidates within which they will choose the most favourable candidate.

Criteria for election in the second phase will be that the candidate was professionally involved in one or more of the following activities: production of electric energy, transfer of energy, distribution, trade, production of equipment for thermo objects, and that it made profit from the relevant activity in the amount of minimal 1.500 million of Euros a year or if the candidate is the leader of consortium who made a profit of 800 million Euros for the past three years.

Public call for prequalification is available in the B&H Official Gazette No 59 on 31 July 2012 and at website Elektroprivreda BiH - www-elektroprivreda.ba.

The call will also be announced in the relevant international and domestic daily newspaper.
Submission deadline is 14 September 2012 until
1100 hrs.